آلة تشكيل ألواح السقف R101






لمزيد من المعلومات ووقت التسليم والأسعار، يرجى مراسلتنا عبر البريد الإلكتروني!
نظرة عامة على المنتج
The R101 Roof Sheet Roll Forming Machine is engineered for producing 1,250 mm R101 trapezoidal roof panels with a high level of dimensional accuracy and stable product consistency. Developed for continuous, high-efficiency forming, this machine meets the demands of modern roofing material manufacturers.
Its structure is built on a reinforced H-beam base, equipped with 70 mm hardened shafts and 18 precision-aligned forming stations. This robust configuration allows the equipment to process 0.3–0.8 mm PPGI, galvanized steel, or Aluzinc coils at production speeds reaching 15 m/min, ensuring smooth performance during long production cycles.
The system can be paired with either a manual or hydraulic decoiler and includes a PLC control unit, hydraulic cutting mechanism, and an optional automatic stacker. These features support quick adjustments and enable operators to complete product changeovers in less than 20 minutes, significantly improving workflow efficiency.
Because of its durability, accuracy, and compatibility with local roofing standards, the R101 Roof Sheet Roll Forming Machine is highly favored in the Mexico market, where R101 and R72 profile panels are commonly used in residential, commercial, and industrial construction. Its reliable output and long service life make it an excellent choice for manufacturers producing high-demand roofing solutions.
رسومات ملف تعريف المنتج
المعايير الفنية
| Profiles | R101 (1 250 mm) & R72 (914 mm) |
| Material Thickness | 0.3–0.8 mm |
| Forming Stations | 18 |
| Shaft Diameter | 70 mm |
| Main Motor | 5.5 kW |
| Hydraulic Unit | 4 kW |
| Line Speed | Up to 15 m/min |
| جهاز فك اللفائف | 5 T manual or motorized |
| Control | Delta PLC + 5.7″ touchscreen |
| Cutting Accuracy | Hydraulic shear, ±2 mm |
| Frame | 16 mm wall‑plate H‑beam |
| Dimensions | ≈ 6 200×850×1 500 mm |
| وزن | ≈ 3.5 T |
| Power Supply | 380 V/50 Hz/3 phase |
| Warranty | 12 months |
| Certifications | CE, ISO |







































































